Télécharger Imprimer la page

Tecno Control CITY CE424P Manuel D'instructions page 61

Masquer les pouces Voir aussi pour CITY CE424P:

Publicité

Dis T.1634007e
ELECTRICAL CONNECTIONS
The electrical connections should be executed all on the housing base.
The details of the connections to the mains, the two batteries, the AUX input and relay output
n.9 are illustrated in
outputs are illustrated in
The terminals are of "polarized inlet" type (1). We suggest to use
lugs adequate to the conductors (2) and to fix the wires to the box
structure to avoid excessive stress to the circuits and to the
terminals. Use a screwdriver (3) with the right dimensions.
Considering that, it should be normal procedure disconnect power to the electronic equipment when
installing, or changing the connections, or when disconnecting or connecting expansion cards.
IMPORTANT: T
THE CONTROL UNIT
(
WIRING CABLES
CONNECT THE FLAT CABLE
Only if necessary, for maintenance or installation requirements, the housing cover can be
separated from its base, first remove mains power and remove the batteries, then disconnect
the flat cable, press on the two side tabs as shown in
cover from sliding hinges (press fit). To reconnect it, proceed in reverse order and after
hanging up the lid hinges, push the flat cable into the connector, respecting the polarization,
the two levers close automatically locking it. Only then you can reconnect power supply.
BATTERIES: Inside the housing, it can also accommodate two 12V/1.3Ah Lead batteries connected in
series (Fig.5) to assure the system powering in case of mains blackout.
The battery life is about 60 minutes with No.8 sensors, but each detector in less increases the
autonomy of about 8 min.
(The batteries are not included in the delivery, but are available on request). If required, to
increase the autonomy, No.2 12V, 3Ah or 7Ah batteries connected in series can be used, but
due to their size, they must be installed outside the control unit.
Considering that each detector absorbs 0.1Ah from the battery, the autonomy, with 8 detectors,
becomes: about 2 hours with 3Ah batteries (each sensor less increases the autonomy by about
20 min) and about 5 hours with 7Ah (each sensor less increases the autonomy of about 50
minutes).
CABLE GLANDS: the lower side of the housing has 13 inputs designed for metric cable glands (ISO
pitch
1.5 mm). No.10
are for glands M16x1.5 mm
for glands M20x1.5 mm
These passages are closed, but they are not
requirements, they must be drilling. To facilitate the operation, they have a centering for the drill bit.
Please, pay attention not touch the tip of the internal circuits or the power supply cables
To guarantee the degree of protection of the enclosure, it is recommended to use cable glands with
protection IP55 or higher.
Ingressi rilevatori
Detectors Inputs
Entrées des sondes
TECNOCONTROL S.r.l. - Via Miglioli, 47 20054 SEGRATE (MI) - Tel. 02. 26 92 28 90 - Fax 02. 21 33 734
CE424P User manual
Fig.
4.
While the details of the connections to the sensors and the other
Fig.
5. The connections with the Remote Units are illustrated in
O AVOID IRREVERSIBLE DAMAGE
, M
AINS POWER AND
)
OR BEFORE YOU INSTALL ANY EXPANSION BOARDS OR UNPLUG OR RE
.
(that accept external cables Ø 6÷12
Fig.4 – Inputs for cable glands
,
DISCONNECT THE POWER SUPPLY TO
B
(
ATTERY
IF PRESENTS
Fig. 3.
Then you need to release the
(that accept external cables Ø 4÷8 mm)
mm).
manually
breakable, according to the installation
Ingresso Alimentazione di Rete
Mains power supply Input
Entrée Alimentation Reseau
Pag. 9/52
Fig. 6
Input terminal,
3
plug-polarized.
2
)
DURING INSTALLATION
and n.3 are
Centro guidapunta
Center for the drill bit
Centre de guidage
1
-

Publicité

loading