Télécharger Imprimer la page

VKI Technologies Espresso Cafe Manuel D'opération page 47

Publicité

Les langues disponibles

Les langues disponibles

WARNING:
extremely hot and can cause severe burns.
Temperature Probe
1. Disconnect
connector on the temperature
probe wiring harness.
2. Loosen the hex nuts securing
the top of the heater to the
heater support.
3. Remove the old temperature
probe.
4. Slide the ring terminal of the new temperature probe (the flat side must be
up) over the threaded stud next to the outlet of the heater.
5. Place the ceramic washer over the temperature probe ring terminal.
6. Install the heater support over the two threaded studs on top of the heater.
The temperature probe ring terminal and flat washer must be between the top
of the heater and the heater support.
7. Tighten the two hex nuts securing the top of the heater to the heater support.
8. Reconnect the inline connector on the temperature probe wiring harness.
Thermal Cut-Off Switch
1. Disconnect the two wires fro m the thermal cut-off switch.
NOTE:
on to the body of the switch to relieve any excess pressure that may
damage it when the wires are pulled.
2. Remove
the
assembly by removing the two hex nuts
securing the retaining bracket to the
heater assembly.
3. Install the new thermal cut-off switch and
secure it in place by installing the
retaining bracket with two hex nuts.
4. Reconnect the two wires to the thermal
cut-off switch.
Replacing Major Components
Use caution when servicing the w ater heater as it may be
the
inline
When disconnecting the thermal cut-off switch wires, hold
thermal cut-off
Flat side up
switch
47

Publicité

loading

Produits Connexes pour VKI Technologies Espresso Cafe

Ce manuel est également adapté pour:

Espresso cafe professional