Wooden Ceiling - Invacare EC-Track Robin Manuel De Maintenance

Système de rails pour lève-personne sur rail
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 51
Remember also to order ceiling brackets when ordering
pendle.
Removable Suspended Ceiling
In case of a removable suspended ceiling, the space above the
suspended ceiling is accessible and pendle brackets and rail can be
installed at the same time.
Concrete ceiling.
Expansion bolts M8x75, 2 pcs.
Yoke (Steel plate for even installation surface), 1 pcs. 3mm.
M8 nuts, 4 pcs.
M8 coupling nuts, 2 pcs. (Collecting sleeve).
M8 locked nuts, 2 pcs.
Aluminium pipes Ø40, 2 pcs.
Ceiling bracket (standard), 1 pcs.
Removable suspended ceiling.
M8 threaded rods, 2 pcs.
Locking washers, 2 pcs. 11x35x2.
(An HKD anchor can be used as an alternative, which the rods are
fixed directly into).
1.
To get the right length of the pendling brackets, use the distance
between the concrete ceiling and the lower face of the suspended
ceiling as your starting point.
This distance is used to determine the length of the pendle
bracket pipe and the threaded rod. Their length must equal the
previously measured distance described above.
2.
When installing, first install the yoke for the center ceiling
bracket. To do this, follow the instructions for the installation
directly in a concrete ceiling. In this case, however, the holes are
drilled for both expansions bolts at the same time.
3.
When driving in the expansion bolts, leave approx. 15 mm
protruding below the nut, so that you can screw the coupling nut
onto it to half its length. Counter-tighten the coupling nut against
the expansion bolt nut. Measure for the hole in a suspended
ceiling and drill/cut this hole to Ø40 mm.
4.
Attach an M8 nut onto the threaded rod (approx. 20 mm onto
the rod) and screw the rod into the coupling nut until it hits the
expansion bolt and counter-tighten the nut.
5.
After completion, push the two aluminium pipes into the
holes and fasten the rail as described in the usual instruction
instructions.
The distance between the suspended ceiling and the ceiling
bracket must be min. 1-5 mm to prevent damages to the
false ceiling.
Fixed Suspended Ceiling
In case of a fixed suspended ceiling, the rail installation is carried out
in two steps. The lowering bracket therefore needs to be secured
without the support from the ceiling bracket.
1586749-B
Concrete ceiling.
Expansion bolts M8x75, 2 pcs.
Yokes, (Steel plate for even installation surface), 2 pcs. 3mm.
M8 nuts, 6 pcs.
M8 coupling nuts, 2 pcs.
M8 locking nuts, 2 pcs.
Aluminium pipes Ø40, 2 pcs.
Distance pipes Ø20 (or nuts and washers), 2 pcs.
Ceiling bracket (standard), 1 pcs.
Suspended ceiling.
M8 threaded rods, 2 pcs.
Locking washers, 2 pcs.
(A HKD anchor can be used as an alternative, which the rods are
fixed directly into).
1.
Cut the pendle bracket pipe to a length equalling the distance
measured between the concrete ceiling and the lower face of the
suspended ceiling minus 50 mm.
This length is appropriate for a double gypsum layer in the ceiling
and an extra allowance of 12 mm.
2.
Cut the threaded rod to a length equalling the distance between
the concrete ceiling and the lower face of the suspended ceiling
minus 10 mm.
3.
When installing, first install the top yoke for the center bracket of
the rail Install the yoke as described in the installation instructions
for direct installation in a concrete ceiling. In this case, however,
drill both holes for the expansion bolts at the same time.
4.
When driving in the expansion bolts, leave approx. 15 mm to
protruding below the nut, so that you can screw the coupling
nut onto it to its half length. Counter-tighten the coupling nut
against the expansion bolt nut.
5.
Attach a nut approx. 20 mm onto the threaded rod and screw
the threaded rod into the coupling nut, until it touches the
expansion bolt, and counter-tighten the nut.
6.
Attach the bottom yoke and secure it with nuts.
Avoid paint on the bottom section of the threaded rods
until the installation is complete.
7.
Prepare the rest of the installation points after a careful and
accurate measuring.
First step of the installation is now complete and the construction
of the suspended ceiling can be completed.
In the final installation, position the distance pipe in the suspended
ceiling. This pipe will protect the suspended ceiling. Cut the distance
pipe to a length creating a distance of 1-5 mm between the lower
face of the suspended ceiling and the upper face of the installation
bracket; instead of pipes, nuts and washers can be used to ensure the
recommended distance.

3.2.3 Wooden Ceiling

CAUTION!
– Do not install rails to a wooden ceiling with tension
screws, such as coach screws.
– Do not install rails to a wooden ceiling with plain wood
screws, without having performed a risk assessment.
Installation
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ec-track robin mover

Table des Matières