Table des Matières

Publicité

SECONDARY SHEAVE
5. Measure:
• Ramp shoe thickness a
Out of specification → Replace the ramp
shoe.
Wear limit:
1.0 mm (0.04 in)

ASSEMBLY

1. Install:
• Stopper
Stopper screw:
7 Nm (0.7 m · kg, 5.1 ft · lb)
2. Install:
• Sliding sheave
• Fixed sheave 1
• Bolts 2
(along with the shims)
Bolt:
10 Nm (1.0 m · kg, 7.2 ft · lb)
3. Install:
• Secondary sheave spring 1
• Spring seat 2
NOTE:
Hook the end of the secondary sheave spring into
the spring holes in the fixed sheave. Hook the other
end of the spring into the holes in the spring seat.
Standard spring position:
3-3 (RS90/RS90R/RSG90/RST90 "USA/
Canada")
1-6 (RS90M/RST90 "Europe"/RST90TF)
4-13
POWR
TR

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Rs90rk, rsg90kRs90mkRst90kRst90tfk

Table des Matières