Berkel 17074-0 Instructions Sur Le Fonctionnement page 40

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 48
D oes not correctly seal
the bag
The bag doesn't
maintain its vacuum
after sealing
D oes not
seal containers
Executive canisters or
Universal Lids do not
maintain the seal
The marinating cycle
does not start correctly
• Make sure the Sealing Bar(6), the Airtight Gasket (7) and Sealing Gasket (9) are
not dirty.
• The bag may be punctured. To check, seal the bag with air inside, place it under
water and squeeze. If you see bubbles, there is a leak. Reseal or use another bag. .
• When you can't completely seal the bag, press the "sealing mode" button (2M) and
increase the sealing time.
• If the Sealing Bar (6) overheats and melts the bag, lift the Cover (5) and allow the
Sealing Bar (6) to cool for a few minutes.
• Check the position and integrity of the Sealing Gasket (9)
• If liquids escape during the vacuum-packing phase, remember that they must first
be refrigerated .
• Leaks along the seal can be caused by wrinkles, crumbs, grease or liquids. Open the
bag, clean the upper part of the inside of the bag and remove any residue from the
Sealing Bar (6) before resealing.
• Make sure the bag is not punctured and thus did not maintain the vacuum. Protect
any pointed edges of the contents in the bag using paper napkins .
• Using the Canister Tube (16), connect the canister lid (or the Lid Attachment if
necessary) and the ACCESSORY PORT (4) on the machine.
• Leave adequate space (at least 3 cm) between the contents and the top of the jar
or canister.
• Make sure that the rim of the jar or canister and universal lid are not damaged in the
sealing zone. Clean the rim and the lid with a damp cloth and reseal.
• Make sure the gasket on the canister lid or universal lid is placed in the correct
position and not damaged .
• Make sure the knob on the canister lid is set to "VACUUM" before vacuum-packing
and that it is set to "CLOSED" after it is complete.
• Check that the O-Ring under the knob on the canister lid or universal lid is correctly
positioned.
• Makes sure that the rim of the jar or canister and universal lid are not damaged in
the sealing zone. Clean the rim and the lid with a damp cloth and reseal.
• Make sure the gasket on the canister lid or universal lid is placed in the correct
position and not damaged.
• Make sure the connection tube is correctly connected to both the canister knob as
well as the ACCESSORY PORT (4) on the machine .
• Make sure the knob on the lid of the Square Executive Canister (cod. ACO1073) is
set to "OPEN - (M)" and that the Handles (1) are attached.
• Check that the O-Ring under the knob on the canister lid or universal lid is correctly
positioned.
• Makes sure that the rim of the jar or canister and universal lid are not damaged in
the sealing zone. Clean the rim and the lid with a damp cloth and reseal.
• Make sure the connection tube is correctly connected to both the canister knob as
well as the ACCESSORY PORT (4) on the machine.
• Make sure the gasket on the canister lid or universal lid is placed in the correct
position and not damaged.
• Lightly press the canister lid down when the first vacuum phase starts until the lights
on the Progress Display (2C) are regularly lit .
40

Publicité

Chapitres

Table des Matières
loading

Table des Matières