Carrying Handle And Bottom Cowling; Exploded Diagram; Removal And Installation Chart - SELVA MARINE Goldfish 4 Manuel D'entretien

Table des Matières

Publicité

BRKT

CARRYING HANDLE AND BOTTOM COWLING

EXPLODED DIAGRAM

15
a
10
M6 x 25 mm
8
14
12

REMOVAL AND INSTALLATION CHART

Step
Procedure/Part name
CARRYING HANDLE AND
BOTTOM COWLING REMOVAL
Top cowling
Choke wire
1
Engine stop switch lead
2
Bolt with washer (carrying handle 2)
3
Bolt with washer (bottom cowling 2)
4
Carrying handle2 (protector)
5
Bottom cowling 2
CARRYING HANDLE AND BOTTOM COWLING
1
9
M6 x 16 mm
13
15
M6 x 25 mm
11
a
b
2
M6 x 16 mm
Q'ty
Follow the left "Step" for removal.
Refer to "INTAKE SYSTEM" in chapter 4.
1
NOTE:
After installation, clamp the engine stop
switch lead to part 2 using the lead clamp
a.
4
3
1
1
NOTE:
Clamp the hi-tension cord using the cord
clamp b, after the bottom cowling 2 has
been fitted.
7-1
6
5
3
Service points
E
7
2
4

Publicité

Table des Matières
loading

Table des Matières