Fixing The Launc Fiber Module Into The Rack; Connecting The Launch Fiber Module - JDSU OTU-8000 Manuel Utilisateur

Unité de test optique rackable pour rfts
Masquer les pouces Voir aussi pour OTU-8000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Chapter 3 Installation of the OTU-8000
Installation of the Launch Fiber Module
Fixing the Launc Fiber module
into the rack
Connecting the Launch Fiber
42
Once the correct brackets are set onto the OSU-9600, you can install it
into the rack.
NOTE
Keep the screws and rings near the rack, for easier handling.
1 Set the Launch Fiber module into the rack, at the height wished
2 While one person is maintaining the module in position, the other
one screws it onto the rack.
You must use one launch fiber for each OTDR. In case you have two
Module
OTDRs, we recommend you to use the JDSU Launch Fiber Module
housing two launch fibers.
You must connect the Launch Fiber Module between the OTDR(s) and
the optical switch(es).
Find your configuration
"OTAU ports" page 29
you see on the schematic views, each OTDR is connected to either C1,
C2, or Common from the OTAU or OSU-9600.
Fig. 47
1 Disconnect the jumper between the C1/C2/Common port of the
OTAU/OSU-9600 and the OTDR
2 Connect one end of the Launch Fiber Module to the OTDR
3 Connect the other end of the Launch Fiber Module to the C1/C2/
Common port of the OTAU/OSU-9600 you disconnected in step1.
Fig. 48
1.depending on the number of OTDRs and testing ports your configuration currently includes.
User Manual
1
(without Launch Fiber Module) by looking in
or
"OSU-9600 additional hardware" page
Configuration before inserting the Launch Fiber Module
L1
L1
Configuration after inserting the Launch Fiber Module
7OTU80010/06
35. As
L2

Publicité

Chapitres

Table des Matières
loading

Table des Matières