Collective Run Signal (Sbm) - Orange Terminal Block; Cif Module; Put Into Operation; Description Of Operating Elements - Wilo Stratos MAXO Notice De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.9
Collective run signal (SBM) – or-
ange terminal block
6.10

CIF module

7

Put into operation

7.1

Description of operating elements

Installation and operating instructions Wilo-Stratos MAXO/-D/-Z
Put into operation
NOTICE
See section 10.1 "Application and function of SSM relay [} 179]"
An integrated collective run signal is available at the SBM terminals as a potential-free
normally open contact.
Contact load:
▪ Permitted minimum: SELV 12 V AC / DC, 10 mA
▪ Permitted maximum: 250 V AC, 1 A, AC1 / 30 V DC, 1 A
NOTICE
See section 10.2 "Application and function of SBM relay [} 180]"
CIF module for bus connection to building automation
DANGER
Risk of fatal electrical shock!
Immediate risk of fatal injury if live components are touched! Check whether all con-
nections are voltage-free!
Installation
▪ Lever out the cover plate in the terminal room from the slot using suitable tools.
▪ Insert the CIF module into the exposed slot with the pin contacts facing forwards and
permanently screw it to the control module. (Screws: included in CIF module scope of
delivery)
Electrical connection of the CIF module (see the installation and operating instructions
of the CIF module).
NOTICE
See section 10.7 "Application and function of CIF module [} 196]"
3.5
1
1.1
2
4
Fig. 35: Operating elements (single pump)
3.6
3
3.1
3.2
3.4
3.3
en
147

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Stratos maxo-dStratos maxo-z

Table des Matières