Operation; Switching The Pump On/Off; Configuration Of The Pump - Ecolab EcoAdd Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9

Operation

Personnel:
Protective equipment:
9.1

Switching the pump on/off

Fig. 83: 'EcoAdd'
1
On/off button
All entries / settings are made via the "touch-sensitive screen".
1.
The pump is switched on and off via the 'ON/OFF button'
2.
After switching on, the pump is ready for operation.
ð At start-up, the pump shows the info screen with the display of the determined
technical data for the connected components.
3.
By pressing the 'start button'
4.
Pressing the 'pause button'
ð The 'operation' screen stops and the pump goes into standby.
5.
By pressing the 'ON/OFF button'
again.
ð The 'operation' screen goes out and the pump is switched off.
9.2

Configuration of the pump

The pump must be configured before operation and this process is
described in:
n
Operator
n
Specialist
Chemical-resistant protective gloves
n
n
Protective eyewear
n
Safety shoes
1
the operation of the pump is started.
stops the pump from operating.
(Fig. 83, pos. 1) the pump can be switched off
Ä Chapter 7.10 'Overview - Configuration' on page 92.
139
Operation
(Fig. 83, pos. 1).
417102276 Rev. 5-02.2020

Publicité

Table des Matières
loading

Table des Matières