Connection Of Pressure Line; Electrical Installation; Inputs And Outputs - Ecolab EMP KKS E60 Manuel D'utilisation

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Device installation
7.1.3

Connection of pressure line

Fig. 10: Connection of pressure line
n
Cut off the metering hose or pipe straight.
Push over the union nut (pos. 2) and crimping ring (pos. 3).
n
n
Attach the hose or the pipe onto the connection piece (pos. 4) until the stop motion
and screw it up by hand.
Adjust angled position by loosening and screwing down the nut again (pos. 1).
n
CAUTION!
Observe max. permissible operation pressure of metering hose/pipe!
NOTICE!
After 24 hours of operation, screw down diagonally the metering head screws
to 3 - 4 Nm.
CAUTION!
Observe max. permissible operation pressure of metering hose/pipe!
7.2

Electrical installation

7.2.1

Inputs and outputs

Electrical installation: Inputs and outputs
417101442 Rev. 12-02.2019
The inputs and outputs are equipped with protective caps in
the as-delivered condition. These caps must be removed when
necessary. (pos. I-VIII)
36

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières