Ecolab EMP KKS E60 Manuel D'utilisation page 239

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.4.3.2 Calibration / Start
Fig. 81: Calibration / Start
The pump runs 122 strokes (ca. 1 min).
The strokes are counted down from 122 to 0.
The oval gear meter pulses (OGM pulses) are counted upwards from 0.
After the running process, the amount removed from the measuring cylinder (
10.4.2.1 'Preparation' on page 100) must be read off. This quantity is then entered as the
calibration value (in ml or l).
NOTICE!
By activating the 'Menu/Exit' function, the running calibration can be
interrupted. If the OGM pulses are not displayed, check all the connections to
the pump!
Calibration / Start - calibration process
During the calibration process, the oval gear pulses
determined appear on the display (Pos. 1).
103
Menu description
Ä Chapter
417101442 Rev. 12-02.2019

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières