Installing The Metering Lock - Ecolab EMP KKS E60 Manuel D'utilisation

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Upgrading the EMP KKS E60 to the EMP KKS E60PLUS

8.2.3.2 Installing the metering lock

NOTICE!
The metering lock function must be activated in menu first.
The selection must also be made of whether the pins 2+4 (input "pulse") or 3+4
(input "metering lock") should be used for the metering monitoring input
Ä Chapter 10.3.15 'Configuration / Batch' on page 93).
(
Fig. 31: Installing the metering lock
3 + 4 = Input metering monitoring with potential-free contact, with selection
„metering lock" at configuration metering monitoring (
10.3.7 'Configuration / Metering lock' on page 75).
PIN
Assignment
3
Relay input
4
GND (┴)
1 +3 + 4 = Input metering monitoring with electronic switch (NPN) with selection
input „metering lock" at configuration metering monitoring (
10.3.7 'Configuration / Metering lock' on page 75).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
417101442 Rev. 12-02.2019
Ä Chapter
54
Ä Chapter

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières