Ecolab EMP KKS E60 Manuel D'utilisation page 178

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Device installation
7.2.3.4 Installation Chargenfunktion
NOTICE!
The batch function must be activated in menu first.
The selection must also be made of whether the pins 2+4 (input "pulse") or 3+4
(input "metering lock") should be used for the batch metering start pulse
Ä Chapter 10.3.5 'Configuration / Code' on page 73).
(
Fig. 16: Installing the batch function
2 + 4 = Input batch function with potential-free contact with selection input
„pulse" at configuration / batch (
on page 93).
PIN
Assignment
2
Relay input
4
GND (┴)
1 +2 + 4 =Input batch function with electronic switch (NPN) with selection input
„pulse" at configuration / batch (
on page 93).
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
or
3 + 4 = Input batch function with potential-free contact with selection input
„metering lock" at configuration / batch (
on page 93).
PIN
Assignment
3
Relay input
4
GND (┴)
1 +3 + 4 = Input batch function with electronic switch (NPN) with selection input
„metering lock" at configuration / batch (
on page 93).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
417101442 Rev. 12-02.2019
Ä Chapter 10.3.15 'Configuration / Batch'
Ä Chapter 10.3.15 'Configuration / Batch'
Ä Chapter 10.3.15 'Configuration / Batch'
Ä Chapter 10.3.15 'Configuration / Batch'
42

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières