Installing The Metering Monitoring - Ecolab EMP KKS E60 Manuel D'utilisation

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2.3.5 Installing the metering monitoring

NOTICE!
The metering monitoring function must be activated in menu first. The selection
must also be made of whether the pins 2+4 (input "pulse") or 3+4 (input
"metering lock") should be used for the metering monitoring input
Ä Chapter 10.3.13 'Configuration / Metering monitoring' on page 82).
(
Fig. 17: Installing the metering monitoring
2 + 4 = Input metering monitoring function with potential-free contact with selection
input „pulse" at configuration / metering monitoring (
10.3.13 'Configuration / Metering monitoring' on page 82).
PIN
Assignment
2
Relay input
4
GND (┴)
1 +2 + 4 = Input metering monitoring function with electronic switch (NPN) with
selection input „pulse" at configuration / metering monitoring (
10.3.13 'Configuration / Metering monitoring' on page 82).
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
or
3 + 4 = Input metering monitoring function with potential-free contact with selection
input „metering lock" at configuration / metering monitoring (
10.3.13 'Configuration / Metering monitoring' on page 82).
PIN
Assignment
3
Relay input
4
GND (┴)
1 +3 + 4 =Input metering monitoring function with electronic switch (NPN) with
selection input „metering lock" at configuration / metering monitoring (
10.3.13 'Configuration / Metering monitoring' on page 82).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
Ä Chapter
43
Device installation
Ä Chapter
Ä Chapter
Ä Chapter
417101442 Rev. 12-02.2019

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières