7.2.4.2 Installing the control via the metering lock (only E20)

Fig. 7.12
NOTE
7.2.5
Connector assignments of slot III (4-pin, E11 and E20)
output for alarm and stroke signal
Fig. 7.13
Remove the protective cap
Mount the connector plug according to the connector assignment.
ATTENTION
417101338_EMPKKS.doc
Even if the metering lock bridge is closed, the electric E20 pump version only operates
when external pulses occur (one pulse = one stroke).
1: Low-level advance warning, empty report and fault
2: Low-level advance warning, empty report and fault
3: Stroke signal (+) (only E20)
4: Stroke signal (-) (only E20)
(plug assignments: see also chapter 12.5.3)
Only use a connector plug from our product range! (included in the delivery scope)
52
Rev: 08-01.10