6.3.1.3 Installing The Dosing Valve In The Correct Position - Ecolab EcoPro Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Mounting and installation

6.3.1.3 Installing the dosing valve in the correct position

Personnel:
Protective equipment:
WARNING!
During installation it is essential to ensure that the valves are installed
according to the direction of flow!
NOTICE!
It is essential that the tightening torques given below are observed, firstly to
ensure the leak-tightness of the system and secondly to ensure the integrity
of the thread.
The tightening torques of the metering head screws are given on an
adhesive label that is affixed to the pump head.
Tightening torque of the suction/pressure valves:
Pump head size
Tightening torque
417102264 Rev. 6-12.2019
n
Mechanic
n
Service personnel
n
Specialist
n
Chemical-resistant protective gloves
n
Protective eyewear
The direction of flow is marked by an impressed arrow on the suction/
pressure valves.
5 l/h and 11 l/h
2 ± 0.2 Nm
44
5 l/h and 11 l/h
2,8 ± 0.2 Nm
5 l/h and 11 l/h
4 ± 0.2 Nm

Publicité

Table des Matières
loading

Table des Matières