Setup; Electronic Versions - Ecolab Elados EMP KKS E10 Notice Technique

Masquer les pouces Voir aussi pour Elados EMP KKS E10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

Setup

Fig. 5.1
Item No.
1
2
3
4
5
6
5.1

Electronic versions

Fig. 5.3
NOTE
417101338_EMPKKS.doc
Description
Suction valve (connection on the suction side)
Diaphragm breakage sequence
Venting connection (refeeding into the container)
Stroke length adjustment
Pump head
Pressure valve (connection on the pressure side)
Flow direction of the metering medium
In version E 11 connection socket I and in version E20 connection sockets I and II must
always be occupied, either by the mounted bridge connectors (protective cap with
corresponding symbol) or by connecting the empty indicator equipment or pulse control
lead (see pin assignment, chapter 12.5.1).
In versions E11 and E20, the bridge connectors (protective cap with corresponding
symbol, see chapter 7.2.2) should be retained after removal for re-use.
Fig. 5.2
Item Description
No.
1
Control knob for setting the stroke length
2
on/off switch
3
on/off/test switch
A
green LED, (ready for use)
B
red LED
(Flashing advance warning level input,
permanently lit empty level input)
C
yellow LED (stroke signal)
D
red LED
(Flashing advance warning level output,
permanently lit empty/fault level output)
I
input (3 pin) for low-level advance
warning and empty report (see 7.2.3)
II
input (4 pin) for pulse signal and
metering lock (see 7.2.4)
III
output (4-pin) for empty report and
stroke signal (see 7.2.5)
44
Rev: 08-01.10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp kks e11Elados emp kks e20

Table des Matières