Setup / Mounting; Setup; Mounting; Mounting Diagram - Ecolab Elados EMP II - E10 Notice Technique

Pompe doseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

Setup / Mounting

5.1

Setup

Fig. 5.1
Pos.
Description
1
On/Off switch
2
Control knob for setting the stroke length
3
Green LED (ready for use)
4
Diaphragm breakage sequence
5
Suction valve (connection on the suction side)
6
Venting connection (refeeding into the container)
7
Pump head
8
Vent screw
9
Pressure valve (connection on the pressure side)
5.2

Mounting

The installation must only be performed by authorized personnel and the general guidelines
WARNING
and local installation regulations must be observed!
• The metering pump should be fitted in an easy-to-access, frost-free location.
• The ambient temperature must not exceed +40° C.
• The mounting position of the device must be horizontal.
5.3

Mounting diagram

417101339_EMP_II_E10
Pos.
Description
1
Overflow valve
2
Pressure control valve
3
Replacement method: Multifunction valve
4
Suction pipe / bottom admission valve
Fig. 5.2
The metering valve, pressure control valve and
pressure relief valve can be replaced by a
NOTE
multifunction valve (MFV) from our product range,
which combines all of these functionalities.
37
Rev. 10-01.19

Publicité

Table des Matières
loading

Table des Matières