Stand Mounting Or Floor Mounting - Ecolab EcoPro-ES-00510X-PFC-00S-1S-S0 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 184
Assembly, installation, modification and upgrades
6.2.1

Stand mounting or floor mounting

Fig. 8: Preparations for stand mounting
1.
Turn mounting plate over
2.
Insert fastening elements from the rear into the four openings marked "table"
(= stand mounting) and secure them.
3.
Turn mounting plate over again and hold it against required mounting position.
4.
Using mounting plate as a template, mark required boreholes with a sharp pencil.
5.
Make the holes.
6.
When mounting plate on a stony subsurface, use suitable dowels and screws to fix
mounting plate in place. In case of table mounting, secure mounting plate in place
with screws, Ø 5 mm.
7.
Place pump on mounting plate.
8.
Slide pump backwards along mounting plate until it engages with an audible click.
9.
10. Attach the connecting lines (hydraulic and electric):
Ä Chapter 6.3.1 'Hydraulic installation' on page 34
Ä Chapter 6.3.4 'Electrical Installation' on page 42.
DANGER!
The mounting plate can also be mounted on a suitable container. No new holes
may be drilled here so as to prevent the metering medium from offgassing.
Only containers which have already been prefabricated over threaded inserts
for mounting pumps may be used.
417102264 Rev. 5-01.2019
Only use fastening elements with the code 1 (Fig. 8, 2) for stand
mounting.
To remove the pump from the mounting plate again, push down on the
retaining plate (Fig. 8, 9).
32

Publicité

Table des Matières
loading

Table des Matières