Pump Head Size 30 L/H And 50 L/H - Ecolab EcoPro-ES-00510X-PFC-00S-1S-S0 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 184
9.8

Pump head size 30 l/h and 50 l/h

Fig. 22: Replacing the pump head and diaphragm
A
Adhesive label: Tightening torque of metering head
screws
1
Metering head screws (4 off)
2
Pump head
3
Diaphragm
4a Intermediate plate without sensor
Note the following points during assembly:
– Fit new protective diaphragm in the correct positions.
– Place in the intermediate plate in the correct position.
– Turn the adapter plate clockwise until the diaphragm rupture drain faces
down.
– Mount the pump head and pay attention to the direction of flow
– Hand-tighten the pump head screws and then tighten them cross-wise.
– Prior to start-up and after 24 hours of operation, the metering head screws
must be diagonally tightened diagonally.
– It is not permitted to exceed the tightening torque to avoid damage to the
thread. If the tightening torque is undershot, this can result in leaks.
Tightening torques, see
1.
Loosen the metering head screws (pos. 1).
2.
Remove the pump head (pos. 2).
3.
Take out diaphragm (3) and intermediate plate (4a or 4b).
4.
Remove the protective diaphragm (5) from the diaphragm extension (6a or 6b).
5.
Remove diaphragm extension (6a or 6b) from the plunger.
6.
Reverse this procedure for re-installation.
4b Intermediate plate with sensor
5
Protective diaphragms
6a Diaphragm extension for intermediate plate without
sensor
6b Diaphragm extension for intermediate plate without
sensor
Ä Chapter 13.6 'Tightening torques' on page 78
59
Maintenance
417102264 Rev. 5-01.2019

Publicité

Table des Matières
loading

Table des Matières