Installation Drawing Suction / Return Valve And Pressure Valve; Replacing The Diaphragm And Pump Head - Ecolab Elados EMP KKS - E10 Notice Technique

Pompe doseuse à membrane et à piston
Masquer les pouces Voir aussi pour Elados EMP KKS - E10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8.2

Installation drawing suction / return valve and pressure valve

8.3

Replacing the diaphragm and pump head

Before opening pump head:
ATTENTION
@
@
@ Loosen the metering head screws (pos. 2).
@ Take off the pump head (pos. 1) absolute straightly.
ATTENTION
The ceramics cylinder can be destroyed when being set on edges!
@ Take ceramics piston (pos. 3) sideways out of the coupling of the diaphragm unit (pos. 4).
@ Un-screw diaphragm unit (pos. 4).
@ Remove intermediate plate (pos. 6).
@ Exchange bellows (pos. 5).
@ Do not overdraw the diaphragm unit (pos. 4) when tightening, screw gently until stop.
The leakage connection of intermediate plate (pos. 6) must be directed downwards.
@ Re-insert the piston (pos. 3).
@ Attach cylinder carefully on the pump head.
@ Hand-screw pump head screws
@ Screw-down cross-over pump head screws
NOTE
ATTENTION
417101338_EMP_KKS_E10
empty connecting lines,
rinse the pump head.
Correct tightening torque: 3 to 4 Nm
Check metering-head bolt tightening torque after 24 hours.
Screw down the pump head absolute straightly. Tighten the metering head evenly
diagonally.
Pos. Description
CONNECTION SET
1
Union nut
A
2
Clamping piece
3
Tapered part
SUCTION-/RETURN VALVE
4
O-Ring, Ø 10 x 2,5
B
5
Suction-/Return valve
6
O-Ring, Ø 14 x 2,5
C
ANGLE CONNECTION
PRESSURE VALVE
4
O-Ring, Ø 10 x 2,5
6
O-Ring, Ø 14 x 2,5
D
Pressure valve (pressure line)
I
Valve spring
7
II
Valve-ball
III
O-Ring, Ø 12 x 1,5
Fig. 8.2
Pos. Description
1
Pump head
2
Metering head screw
3
Ceramics piston
4
Diaphragm unit
5
Bellows
6
Intermediate plate
Fig. 8.3
36
Rev: 09-08.12

Publicité

Table des Matières
loading

Table des Matières