Connecting The Suction Pipe And Pressure Pipe; Electrical Installation; Power Supply - Ecolab Elados EMP III E60 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation of a metering monitoring system:
A metering monitoring system – oval gear meter (1) or flow indicator -
has to be installed in the metering pipeline between the pressure
relieve valve and the pressure control resp.metering valve.
7.1.2

Connecting the suction pipe and pressure pipe

Fig. 7.11 Connecting the
suction pipe and
pressure pipe
7.2

Electrical installation

7.2.1

Power supply

Inner view of switch box, 1 Phase-Motor
*coloured marker according to IEC 757
Fig. 7.12
Electrical installation: power supply
WARNING
NOTE
417101441_EMP_III_E60.docx
Fig. 7.10 Device installation: Hydraulic installation Installation examples 10
Pos.
Description
1
Metering hose
2
Union nut
3
Clamping piece
4
Tapered part
5
O-ring
6
Pressure valve
7
Suction valve
P
Pressure side
S
Suction side
CAUTION
NOTE
 Trim the hose to the precise length
 Slide the union nut (pos. 2) and Clamping piece (pos. 3) over the hose
and attach the hose to the tapered part up to the stop collar (pos. 4).
 Insert the O-ring (pos. 5) into the valve groove and tighten the union nut.
 Place the suction pipe in the delivery bundle.
The mains voltage has to correspond with the value indicated on the nameplate.
The metering pump is provided with an installed thermic winding protector, which stops
the motor when overheated.
When connecting the suction and pressure pipes,
ensure that the O-rings (Pos. 5) are fixed to the
connectors so as to achieve the required seal.
The use of an appropriate suction pipe from our
product range is recommended.
Power connection should be produced according to the
current CE guidelines. Furthermore, the specific
regulations, which were enforced in every single country,
as well as all regulations established by local electric
supply companies have to be observed.
In the left fig. you can see the connection plan for an
1-Phase-Motor.
In addition to that, you will find all connection plans on
the cover of the motor's terminal box.
Pos.
Description
1
Mains line
- 84 -
Rev. 13-10.19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp iii e60 plus

Table des Matières