Connector Assignments Of Slot Vii (5-Terminal) Input For Batch Pulse And Metering Lock; Installing The Batch Pulse - Ecolab Elados EMP III E60 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8.2.2
Connector assignments of Slot VII (5-terminal)
input for batch pulse and metering lock
Fig. 8.6
Connector assignments of slot VII (5-terminal), input for batch pulse and metering lock
 Remove the protective cap
 Mount the connector plug according to the connector assignment.
WARNING

8.2.2.1 Installing the batch pulse

NOTE
2
+
4
= Input batch metering with potential-free contact with selection input „pulse" at
configuration / batch (see chapter 10.3.14).
PIN
Assignment
2
Relay input
4
GND (┴)
1 +2
+
4
= Input batch metering with electronic switch (NPN) with selection input „pulse" at
configuration / batch (see chapter 10.3.14)
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
or
3
+
4
= Input batch metering with potential-free contact with selection input „metering lock" at
configuration / batch (see chapter 10.3.14).
PIN
Assignment
3
Relay input
4
GND (┴)
1 +3
+
4
= Input batch metering with electronic switch (NPN) with selection input „metering lock" at
configuration / batch (see chapter 10.3.14).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
417101441_EMP_III_E60.docx
Conductor coloring
Pin
(cable connection)
1
brown
2
white
3
blue
4
black
5
grey
Only use a connector plug from our product range!
The batch function must be activated in menu first. The selection must also be made of
whether the pins
2+4
(input "pulse") or
batch metering start pulse (see chapter
Assignment
Output 5 V, DC (load with max. 50 mA)
Input batch metering
Input metering lock
GND (┴)
Free for future use
3+4
(input "metering lock") should be used for the
10.3.14
"Configuration / batch")
Fig. 8.7
Installing the batch impulse
- 93 -
Rev. 13-10.19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp iii e60 plus

Table des Matières