10.4.2.1 Preparation
The volume of the measuring cylinder should be 1/50 of the metering pump rate in litres/h.
During this process, the suction tube must not change its position.
NOTE
The calibration of the metering pump is only valid for the currently set stroke length setting.
After changing the stroke length, the calibration must be performed again.
10.4.2.2 Calibration / Start
Fig. 10.46 Calibration / Start
to
:
The pump runs 122 strokes (ca. 1 min).
The strokes are counted down from 122 to 0.
NOTE
By activating the 'Menu/Exit' function, the running calibration can be interrupted.
to
: After the running process, the amount removed from the measuring cylinder
10.4.3
Calibration pump with oval gear meter
If a dongle box and an oval gear meter are connected and the "oval gear meter" function
(see chapter
is activated, the oval gear meter pulse rate recorded is automatically displayed at the end of
the calibration process.
This is offset against the specified calibration value. A correlation thus occurs between the
oval gear meter pulses and the metered quantity.
417101441_EMP_III_E60.docx
Fig. 10.45 Calibration / pump: Preparation
Connect the pump ready for operation on the pressure
Fill a suitable measuring cylinder and insert the
(see chapter
10.4.2.1
This quantity is then entered as the calibration value (in ml or l).
10.3.11
"Configuration / Oval gear meter (only
side (see section
7
suction line.
"Preparation") must be read off.
(OGM
PLUS
)
- 115 -
"Installing the device").
E60
&
OGM
or
OGM
PLUS
)")
PLUS
Rev. 13-10.19