Connector Assignment Of Slot Ii (5-Terminal) Input For Pulse Signal, Standard Signal, Metering Lock, Batch And Metering Monitoring; Installing The Pulse Control (Water Meter); Installing The Standard Signal Control - Ecolab Elados EMP III E60 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2.4
Connector assignment of slot II (5-terminal)
Input for pulse signal, standard signal, metering lock, batch and metering monitoring
Fig. 7.16
Connector assignments of Slot I (3-terminal),
 Remove the protective cap
 Mount the connector plug according to the connector assignment.
WARNING

7.2.4.1 Installing the pulse control (water meter)

7.2.4.2 Installing the standard signal control

WARNING
417101441_EMP_III_E60.docx
Conductor coloring
Pin
(cable connection)
1
brown
2
white
3
4
black
5
(plug assignments: see also chapter 14.5.2)
Only use a connector plug from our product range! (included in the delivery scope)
2
+
PIN
2
4
1
+
PIN
1
2
4
Fig. 7.17 Installing the pulse control (water meter)
4
PIN
Fig. 7.18 Installing the standard signal control
Observe correct polarity during connection!
Assignment
output 5 V, DC (loadable with max. 50 mA)
pulse input (also as configurable batch / metering
monitoring; see
metering lock (also as configurable batch / metering
blue
monitoring, see
GND (┴)
grey
Input standard signal 0/4...20 mA
4
= Pulse input with potential-free contact
Assignment
Relay input
GND (┴)
2
+
4
= Pulse input with electronic switch (NPN)
Assignment
5 V, DC
Relay input
GND (┴)
The minimum pulse- or pause time is 15 ms.
+
5
= Standard signal input 0/4 – 20 mA
Assignment
4
0/4-20 mA (-)
5
0/4-20 mA (+)
- 86 -
10.3.13
& 10.3.14)
10.3.13
& 10.3.14)
Rev. 13-10.19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp iii e60 plus

Table des Matières