Installing The Metering Monitoring; Connector Assignments Of Slot Iii (4-Terminal) Output For Alarm And Stroke Signal - Ecolab Elados EMP II E60 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2.3.5

Installing the metering monitoring

The metering monitoring function must be activated in menu first. The selection must also
NOTE
be made of whether the pins
used for the metering monitoring input (see chapter 10.3.13).
2
+
4
= Input metering monitoring function with potential-free contact with selection input „pulse"
at configuration / metering monitoring (see chapter 10.3.13).
PIN
Assignment
2
Relay input
4
GND (┴)
1 +2
+
4
= Input metering monitoring function with electronic switch (NPN) with selection input
„pulse" at configuration / metering monitoring (see chapter 10.3.13).
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
or
3
+
4
= Input metering monitoring function with potential-free contact with selection input
„metering lock" at configuration / metering monitoring (see chapter 10.3.13).
PIN
Assignment
3
Relay input
4
GND (┴)
1 +3
+
4
= Input metering monitoring function with electronic switch (NPN) with selection input
„metering lock" at configuration / metering monitoring (see chapter 10.3.13).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
7.2.4

Connector assignments of slot III (4-terminal) output for alarm and stroke signal

2
3
4
Fig. 7.18 Connector assignments of slot III (4-terminal) output for alarm and stroke signal
 Remove the protective cap
 Mount the connector plug according to the connector assignment.
WARNING
Only use a connector plug from our product range! (included in the delivery scope)
417101438_EMP_II_E60
Conductor coloring
Pin
(cable connection)
1
brown
1
2
white
3
blue
4
black
(plug assignments: see chapter
(4-terminal)")
2+4
(input "pulse") or
3+4
Fig. 7.17
Assignment
Output low-level warning, empty report and fault (+)
Output low-level warning, empty report and fault (-)
Output stroke signal (+)
Output stroke signal (-)
14.3.5.3
"Pin assignment / conductor coloring Connector III
- 89 -
(input "metering lock") should be
Installing the metering monitoring
Rev. 12-01.19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp ii e60plus

Table des Matières