10.3.10.1 Selecting; 10.3.10.2 Display In The Operating Display With An Active Pulse Memory; Configuration / Oval Gear Meter (Only E60 Plus & Ogm Plus ) - Ecolab Elados EMP II E60 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.3.10.1 Selecting

10.3.10.2 Display in the operating display with an active pulse memory

Display in
operation
10.3.11 Configuration / Oval gear meter (only
The oval gear meter function makes it possible to record a "real" value in the operating
data/liter menu item (see chapter 10.5.3). Furthermore, this menu item must be enabled to
use the metering controller function (see chapter 10.3.12).
The function oval gear meter can only be activated if the pump is upgraded with a
Box
(Art. No.248606, EBS No. 10016094) to the
see Accessories) is connected.
To activate the Dongle-Box in connection with the oval gear meter, the power supply has to
be switched off and on again! (Unplug power plug or switch the pump off and back on again!)
If the dongle box is fitted and is activated by switching the pump off and then on again,
"E60+" appears on the bottom left of the pump's display unit. If an
meter) is connected to slot V on the
and then on again, "E60++" appears on the pump's display unit, and the oval gear meter
function is automatically enabled under "Configuration" in the pump menu and the function
dosing regulator can be selected now.
If the pump software recognises that there is a
the communication is then interrupted between the pump and the periphery unit (e.g. through
the removal of the unit), an error message is displayed (see chapter
(display)"). To prevent this error message appearing repeatedly, the communication
(connection) must be restored, or the analysis must be disabled in the pump software.
(see capter
12.2.1
417101438_EMP_II_E60
Meaning
Pulse multiplication
(Example: 10 external pulses
become 20 strokes)
Pulse division
(Example: 10 external pulses
become 20 strokes)
dongle box
„Deactivating of the
dongle box
Fig. 10.24 Configuration / pulse memory: Selecting
-
Pos
1
Pulse memory active
2
Number of pulses received
3
Set factor
Fig. 10.25 Display in the operating display with an active pulse memory:
pulse multiplication
Fig. 10.26 Display in the operating display with an active pulse memory:
pulse division
E60
PLUS
&
OGM
PLUS
)
E60
and an
PLUS
and is activated by switching the pump off
dongle box
or an
or
OGM
PLUS
- 109 -
pulse memory is inactive.
(Default setting)
pulse memory is active.
Description
Dongle-
OGM
(oval gear meter
PLUS
OGM
PLUS
(oval gear
OGM
PLUS
connected, and
12.2
"Alarm messages
in the pump software").
Rev. 12-01.19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp ii e60plus

Table des Matières