Installing The Batch Pulse - Ecolab EMP KKS E60 Manuel D'utilisation

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8.2.3.1 Installing the batch pulse

NOTICE!
The batch function must be activated in menu first.
The selection must also be made of whether the pins 2+4 (input "pulse") or 3+4
(input "metering lock") should be used for the batch metering start pulse
Ä Chapter 7.2.3.4 ' Installation Chargenfunktion' on page 42).
(
Fig. 30: Installing the batch pulse
2 + 4 = Input batch metering with potential-free contact with selection input
„pulse" at configuration / batch (
on page 93).
PIN
Assignment
2
Relay input
4
GND (┴)
1 +2 + 4 = Input batch metering with electronic switch (NPN) with selection input
„pulse" at configuration / batch (
on page 93).
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
oder
3 + 4 = Input batch metering with potential-free contact with selection input
„metering lock" at configuration / batch (
on page 93).
PIN
Assignment
3
Relay input
4
GND (┴)
1 + 3 + 4 = Input batch metering with electronic switch (NPN) with selection input
„metering lock" at configuration / batch (
on page 93).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
Upgrading the EMP KKS E60 to the EMP KKS E60PLUS
Ä Chapter 10.3.15 'Configuration / Batch'
Ä Chapter 10.3.15 'Configuration / Batch'
53
Ä Chapter 10.3.15 'Configuration / Batch'
Ä Chapter 10.3.15 'Configuration / Batch'
417101442 Rev. 12-02.2019

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières