8.2.3.1 Installing the batch pulse
NOTICE!
The batch function must be activated in menu first.
The selection must also be made of whether the pins 2+4 (input "pulse") or 3+4
(input "metering lock") should be used for the batch metering start pulse
Ä Chapter 7.2.3.4 ' Installation Chargenfunktion' on page 42).
(
Fig. 30: Installing the batch pulse
2 + 4 = Input batch metering with potential-free contact with selection input
„pulse" at configuration / batch (
on page 93).
PIN
Assignment
2
Relay input
4
GND (┴)
1 +2 + 4 = Input batch metering with electronic switch (NPN) with selection input
„pulse" at configuration / batch (
on page 93).
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
oder
3 + 4 = Input batch metering with potential-free contact with selection input
„metering lock" at configuration / batch (
on page 93).
PIN
Assignment
3
Relay input
4
GND (┴)
1 + 3 + 4 = Input batch metering with electronic switch (NPN) with selection input
„metering lock" at configuration / batch (
on page 93).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
Upgrading the EMP KKS E60 to the EMP KKS E60PLUS
Ä Chapter 10.3.15 'Configuration / Batch'
Ä Chapter 10.3.15 'Configuration / Batch'
53
Ä Chapter 10.3.15 'Configuration / Batch'
Ä Chapter 10.3.15 'Configuration / Batch'
417101442 Rev. 12-02.2019