Ecolab EMP KKS E60 Manuel D'utilisation page 192

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Upgrading the EMP KKS E60 to the EMP KKS E60PLUS
8.2.4.1 Installing the pulse control (water meter)
Fig. 33: Installing the pulse control (water meter)
The minimum pulse- or pause time is 15 ms.
Fig. 34: Impuls-, Pausendauer
2 + 4 = Pulse input with potential-free contact
PIN
Assignment
2
Relay input
4
GND (┴)
1 + 2 + 4 = Pulse input with electronic switch
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
8.2.4.2 Installation Normsignal (mA)
Fig. 35: Installing the standard signal (mA)
4
0/4-20 mA (-)
Standard signal input 0/4 – 20 mA
CAUTION!
Observe correct polarity during connection!
417101442 Rev. 12-02.2019
5
0/4-20 mA (+)
56

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières