Ecolab EMP KKS E60 Manuel D'utilisation page 164

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Setup
5
Setup
5.1
EMP KKS E60
Fig. 3: EMP KKS E60 (Front and side view)
5.2
EMP KKS E60
Fig. 4: EMP KKS E60
Pos.
Description
1
Suction valve (connection on the suction side)
2
Diaphragm breakage sequence
3
Venting connection (refeeding into the container)
4
Stroke length adjustment
5
Pump head
6
Pressure valve (connection on the pressure side)
A
Rail for connecting the dongle box
B
Dongle box
è
Flow direction of the metering medium
417101442 Rev. 12-02.2019
+
+
(Front and side view)
28

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières