Installation And Start-Up; Setting Back-Pressure (Pressure Holding) - Ecolab MFV II Manuel D'utilisation

Soupape multifunction
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.2
Start up
1.
Ensure that the metering line is not shut off at any place.
2.
Venting (
5.2.1

Setting back-pressure (pressure holding)

The back-pressure is adjusted to 0,1 MPa (1 bar) + 20%, on the manufacturing side.
If a different pressure is required, the adjustment can be done as follows:
1.
Remove the sealing plug (Pos. 10) at the pressure holding operation button (Pos. 2)
either manually or with a small screwdriver.
2.
Disengage the screw (Pos. 11) and remove the operation button.
3.
Pull out the adjustment button (item 12) slightly and set the desired counter pressure
by turning (right stop approx. 0,1 MPa (1 bar), left stop approx. 0,05 MPa (0,5 bar).
4.
Then fixate the adjustment button by pushing it back in, replace the operation button,
tighten the screw and insert the sealing plug.
Fig. 3: Setting back pressure (pressure holding function)
2
Operation button
10 Sealing plug
Ä Chapter 4.2.3 'Venting function' on page 21).

Installation and Start-up

11
Screw
12 Adjustment button
23
417101224 Rev. 05-05.2019

Publicité

Table des Matières
loading

Table des Matières