The owner is also required:
n
to provide personal protective equipment (PPE).
n
to incorporate the measures into operating instructions and to instruct personnel
accordingly;
n
for operating sites (from 1m above ground): to provide safe access;
n
to provide suitable workplace lighting in accordance with ASR 7/3.
n
to ensure that local regulations are complied with during installation and
commissioning, if these procedures are conducted by the owner.
2.9

Installation, maintenance and repair work

NOTICE!
Material damage by using incorrect tools!
Material damage may arise by using incorrect tools during assembly,
maintenance or troubleshooting. Only use the correct tools.
DANGER!
Damage and injuries may occur if installation, maintenance or repair
work is carried out incorrectly.
– All installation, maintenance and repair work must only be performed by
authorised and trained specialist personnel in accordance with the
applicable local regulations.
– Safety regulations and prescribed protective clothing when handling
chemicals should be followed. Attention must be paid to the information
included on the product data sheet for the metering medium used.
– Prior to installation, maintenance and repair works the feeding of the dosing
medium should be disconnected and the system cleaned.
NOTICE!
Only original equipment spare parts may be used for maintenance and
repairs.