Electrical Installation - Ecolab Elados EMP III - E00 Manuel D'utilisation

Pompe doseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.
Trim the hose to the precise length.
2.
Slide the union nut (pos. 2) and Clamping piece (pos. 3) over the hose and attach
the hose to the tapered part up to the stop collar (pos. 4).
3.
Insert the O-ring (pos. 5) into the valve groove and tighten the union nut.
4.
Place the suction pipe in the delivery bundle.
5.4.2

Electrical installation

Personnel:
DANGER!
Risk of electric shock
Pay attention to disconnect the power supply immediately and to secure
against accidental switch-on!
CAUTION!
Mains Connection
The electrical connection must be made in accordance with the applicable CE
directives. In addition, the respective country regulations and local
EVU regulations must be observed.
1 Metering hose
2 Union nut
3 Clamping piece
4 Tapered part
5 O-ring
6 Pressure valve
7 Suction valve
n
Qualified electrician
33
Assembly, mounting and installation
417102233 Rev. 3-03.2019

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp iii - e10

Table des Matières