Electrical Installation; Mains Supply Connection; Mains Connector; Mains Connector Layout - Ecolab Elados EDPL V15 Notice Technique

Pompe doseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2

Electrical installation

7.2.1

Mains supply connection

7.2.2

Mains connector

7.2.2.1 Mains connector layout

7.2.2.2 Mains connector - cable assignment

Fig. 7.16
Cable
connection
417102213_EDP L_V15.docx
Fig. 7.13
 Connect the mains connector provided
(see chapter
3
Scope of delivery) on the mains connection
of the pump (pos. 1) and hand-tighten it.
Fig. 7.14
The mains connector (pos. 1) is coded and can only be inserted
in one position into the bush of the pump (see Fig. 7.13, Item 1).
 Attach the connector to the bush by means of the knurled nut
(pos. 2) and hand-tighten it.
Item
Description
1
Mains connector
2
Knurled nut
Item
Description
1
Cable connections
2
Seal
3
Cable fixing
4
Connector housing
5
Intermediate screw fitting
6
Cable clamp
7
Connector insert with clamps
Fig. 7.15
Fig. 7.17
Plug-and-socket
connection
- 44 -
Item
Description
1
L1
2
N
PE
Rev. 1.10.11

Publicité

Table des Matières
loading

Table des Matières