Ecolab Elados EMP III - E00 Manuel D'utilisation page 100

Pompe doseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Assembly, mounting and installation
The dosing pump is equipped with a built-in thermal winding protection which
switches off the motor in the event of overheating. With version E10, the
indicator lamp also lights up when temperature protection is triggered.
The following graphic charts display the connection plans for versions E00/E10/ – 1-phase
motor and E00 3-phase motor.
The connection diagrams can also be seen in the terminal box cover of the
motor.
1.
Open the terminal box on the EMP III pump.
2.
Connect the power cable according to the terminal diagram.
3.
Connect the mains power supply cable to the power grid.
Terminal box interior view: Version E00/E10 - 1-phase motor
Terminal box interior view: Version E00 3-phase motor
CAUTION!
When connecting the 3-phase motor, particular attention has to be paid to the
correct sense of rotation. The mains voltage has to correspond with the value
indicated on the nameplate.
417102233 Rev. 3-03.2019
1 =power cable
1 = power cable
34

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp iii - e10

Table des Matières