Dimension deviations
Approved deviations from wall opening dimensions in accordance with DIN 18100
If the gross construction openings (masonry, concrete, porous concrete) do not offer sufficient space for the protective boxes of the frame-
box, the wall openings must be chiselled out for the protective boxes. In order to ensure the functioning of the door, the protective boxes
must not be removed!
Where the dimensional tolerances are exceeded, the correct functioning and stability of the door can no longer be guaranteed.
GB
Masonry
Width = coordinating size (width) + 20 /– 0 mm
Height = coordinating size (height) + 15 / – 0 mm
max.
10 mm
F60-A / F90-A stud partition wall
Width = coordinating size (width) + 10 /– 0 mm
Height = coordinating size (height) + 5 / – 0 mm
F60-B / F90-B timber partition wall
Width = coordinating size (width) + 10 /– 0 mm
Height = coordinating size (height) + 5 / – 0 mm
max.
5 mm
Note:
A twisting of the frame uprights during installation,
particularly in the case of corner frames, is not
permitted for functional reasons!
24
Gross gap width
Coordinating size (width)
Clear width
Coordinating size (width) = Gross gap width
Clear width
Gross gap width
Coordinating size (width)
Clear width
CORRECT
Please keep these assembly, operating and maintenance instructions as long as you use the product!
max.
10 mm
max.
5 mm
Upper surface
of finished floor
Upper surface
of finished floor
Upper surface
of finished floor