Measuring Unit; Infrared Remote Control; Vehicle Preparation For Setting Operations; Measuring Unit - SICE A98 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

- Monitor (1, fig. 2): shows the jobs screens with the drawings of the angles measured; the
operative controls are at the bottom.
- Keyboard (2, fig. 2): used to select the controls and to enter alphanumeric data.
• The ENTER key recalls the control selected with the arrow keys.
• The F2 key is used to go back to the previous step.
- Personal Computer (4, fig. 2): contains and runs the vehicle alignment program.
- Printer (3, fig. 2): gives out the result of the job done as printouts.
- MAIN SIM CARD: card to enable aligner operation.
- Power supply plug
Jobs screen (fig. 7)
A) Title (e.g. FRONT AXLE): indicates which procedure is being used.
B) Values read on the vehicle.
C) Databank values
D) Graph comparison between values read and databank values.
E) Target level indications (LEVELS).
F) Representation of angles read at the moment.
G) HELP: used to recall the on-line help.
H) Icon bar: icons to scroll the program. Find further information on the selected icon in the
feedback bar.
I)
Feedback bar: displays a help message relating to the function of the selected icon.
L) Vehicle name bar: displays the name of the vehicle selected from the databank.
When a vehicle is selected from the databank the selected market is indicated.
M) Status bar: displays the system messages.
N) Axle values difference: window that indicates the value and the databank reference of the
difference of the right and left values of the read angle. This window is shown only then
there is a reference value in the databank.
O) Working area: section of the screen that shows the information of the job being done.
The aligner comes with an infrared remote control to allow the operator to use the aligner
software while carrying out measurements and adjustments on the vehicle.
The remote control transmitter has two pushbuttons that correspond to the selections made by
the function keys F2 and F3 on the monitor.
To use the remote control correctly, it is advisable to orient the transmitter towards the receiver
installed on the measuring unit (A, fig. 4a) and hold down the desired key for at least a second
to guarantee a correct communication.
The power supply system is equipped with a standard 9V battery.

VEHICLE PREPARATION FOR SETTING OPERATIONS

In order to perform wheel alignment correctly, all parts of the vehicle must be in compliance with
the manufacturer's specifications; it is especially important to check the tyre pressure and
eliminate play in bearings and ball joints.
Position the vehicle over an inspection pit or on a lift that is correctly equipped for alignment
operations. Make sure that the turntables and oscillating footboards are locked.
Mount the self-centering clamps on the wheels and lock them on the rim using the handles.

Measuring Unit

INFRARED REMOTE CONTROL

16

Publicité

Table des Matières
loading

Table des Matières