Krick ro marin Dusseldorf Mode D'emploi page 44

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The bracket is to be mounted with the Ø 2.9 x 6.5 mm self-tapping screws (28). The gear pump serves as an
extinguishing pump (29) and is fastened according to plan with the self-tapping screws (30) (Ø 2.9 x 9.5
mm). The pump must be equipped with a suppression set (31) and appropriate connection cables (22) in
accordance with the enclosed instructions. For special requirements it is also possible to install a second and
third pump.
The now completed pump plate must now be inserted according to the plan and photo and glued with
acrylite.
The next step is to make the steering linkage. The Ø 1.5 mm steel wire (32) is tinned cleanly at both ends.
Solder a clevis (33) at one end. Hook the linkage into the angle rudder lever 11.
The second clevis (33) with lock nut (34) and threaded bushing (35) is hooked into the servo-rod lever cut
according to plan. Determine the length of the boom (32). Cut the wire to length and solder in the threaded
bushing.
Main deck:
The edges of the main deck (36) are sanded all around, the glue edges are roughened. Proceed in the same
way with the long coaming parts (37) and the transverse edge (38). The hatch (39) and the boat hatch (40)
are carefully removed and also sanded and fitted.
Insert the coaming parts (37 and 38) into the deck and glue them together with cyano.
44b
44c
37
45
44f
44a
44e
36
8
© Klaus Krick Modelltechnik, Knittlingen, Germany
Status 08/2022

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ro1100Romarin ro1100Romarin ro1101Romarin ro1103

Table des Matières