Télécharger Imprimer la page

Blodgett Export Serie Manuel D'installation Et D'utilisation page 13

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 66
Installation
Utility Connection
ELECTRICAL CONNECTION
NOTE: Electrical connection must be performed
by a qualified installer only.
NOTE: The electrical connection must comply
with National and Local codes.
A strain relief for the supply cord is required. The
installer must provide a supply cord bushing that
meets all Local and National Installation Stan-
dards.
For Gas Models:
NOTE: Gas models have a phase sensitive burner
control unit. If the phase and neutral are
switched the control locks out.
Connect phase + neutral + ground.
KW/Section
KW/S
i
Voltage
V l
CTB/CTBR
5,6
400
8,0
400
KCO-25E
3,0
230
Mark V-III
11,0
400
Zephaire-E
11,0
400
DFG-100-3
0,7
230
DFG-50
0,7
230
Zephaire-G-L
0,7
230
AC-500
1,3
230
All manuals and user guides at all-guides.com
For Electric Models:
Connect the oven to a separate group with rigid
connection and circuit breaker. The circuit breaker
should disconnect all poles, including neutral with
a contact separation of at least 3 mm.
For 1 Phase --- Connect
ground.
For 3 Phase --- Connect L1 + L2 + L3 + neutral +
ground.
INITIAL STARTUP
1. Set the THERMOSTAT to 260_C and operate
2. Clean the oven after the initial burn-in process.
Frequency
q
y
Ph
Phase
(H )
(Hz)
3N
50
3N
50
1N
50
3N
50
3N
50
1N
50
1N
50
1N
50
1N
50
10
phase + neutral +
for 2 hours prior to loading product. This pro-
cedure produces smoke.
See page 20 for proper cleaning instructions.
Max Load
L1
L2
9
8
13
11
13
---
18
15
18
15
3
---
3
---
3
---
6
---
L3
N
8
1
11
2
---
13
15
3
15
3
---
3
---
3
---
3
---
6

Publicité

loading