Télécharger Imprimer la page

Blodgett Export Serie Manuel D'installation Et D'utilisation page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 66
Installation
Utility Connection
GAS CONNECTION (if applicable)
Connect the oven to the gas line with the proper
type of gas according to Local and National Instal-
lation Standards.
Setting Equipment for Other Types of Gas
1. Shut off the gas valve and turn off the operat-
ing switch.
2. Dismantle the gas block by means of cou-
plings.
3. Dismantle the burner and replace the injec-
tors.
4. Install the burner and gas block.
5. Check for leakage and possible loose electri-
cal connections.
6. Adjust gas pressure if necessary, See figure.
Gas Pressure
Adjustment
Pressure Tap
DFG-50
All manuals and user guides at all-guides.com
INLET PRESSURE TAP
NOTE: Zephaire-G/DFG-50 units only. See figure
1. Remove the blue pipe cap from the gas inlet
2. Apply thread sealer to the male pipe threads.
3. Thread the inlet pressure tap assembly onto
4. Check for leaks.
Pressure
Tap
DFG-100 and Zephaire-G
Figure 11
8
for pressure tap location.
pipe.
the gas pipe and tighten.
Pressure Tap
Back of Oven All Units
Manifold
Pressure
Tap
Gas
Connection
Manifold
AC-500

Publicité

loading