Télécharger Imprimer la page

Honeywell MILLER Soll Vi-Go Guide D'installation page 181

Masquer les pouces Voir aussi pour MILLER Soll Vi-Go:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 69
SÖLL VI-GO - VERTICAL ARREST SYSTEM CHECK/ACCEPTANCE SHEET
II -  SÖLL VI-GO - VERTICAL ARREST SYSTEM CHECK/ACCEPTANCE SHEET
1. OPERATING COMPANY
2. INSTALLATION COMPANY
3. NAME:
4. ADDRESS:
5. HANDED OVER TO: (Operating company or its representative)(Name, signature):
6. DATE:
7. NEXT VERIFICATION ON: (IN 1 YEAR):
CHECKLIST (please put a tickmark):
YES NO
8.
9. The fall arrester has been checked for perfect functioning.
10. The upper cable anchor point is always above the person to be secured.
11. All fasteners on the Söll Vi-Go vertical arrest system have been tightened as required.
12. Only anti-corrosive screw connections have been used.
13. The cable is adequately pre-tensioned. (See the cable tensioner)
14. The ID plate is clearly visible.
15. A trial run has been carried out.
16. This guide has been handed over to the operating company.
17. Only the components of Honeywell Fall Protection Deutschland GmbH & Co. KG
have been used (except for the dowels for concrete).
19. COMMENTS
181

Publicité

loading