GENERAL WARNINGS
Operators have a duty to familia-
rise
themselves
using this manual before perfor-
ming any intervention, adopting the
specific safety requirements to make
every kind of human-computer inte-
raction safe.
Any technical modification that af-
fects the operation or safety of
the machine must only be carried
out by the technical personnel of the
manufacturer or by technicians that are
formally authorised by the manufactu-
rer. Failure to do so exempts the manu-
facturer from any liability for for any
possible resulting modifications or da-
mage.
Even after appropriate familiari-
sation, upon the first use of the
appliance, in any case simulate a
number of test operations to save more
rapidly the main functions of the ap-
pliance, e.g. start-up, shut-down, etc.
The appliance is provided already
tested by the manufacturer and fit-
ted with the type of gas and electri-
cal supply specified on the rating plate
applies.
In case of supply with LPG
gas (Butane or Propane) at 50
mbar,a pressure stabilizer 50 mbar
must be installed upstream of the
appliance.
FIRST COMMISSIONING
UP / Upon completion of the opera-
tions of positioning and connection to
the power sources, perform a series of
operations such as:
1. Cleaning away of the protective ma-
terials (oils, grease, silicones, etc.) insi-
de and outside of the cooking chamber
(see section 3 / Removal of protective
materials).
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.

OPERATIONS FOR COMMISSIONING

2. General checks and controls such as:
Check opening of switches & network
gate valves (e.g. water, electricity, gas
adequately,
when applicable); Checking of drains;
Checking and monitoring of the exter-
nal fumes/vapour extraction; Checking
and monitoring of the protection panels
(all the panels must be fitted correctly).
PRESSURE DETECTION
GAS INLET
G20 20 mbar ≤ 17 mbar) suspend the
installation and contact the gas di-
stribution service.
20 mbar ≤ 25 mbar) suspend the in-
stallation and contact the gas distri-
bution service.
is lower or higher than the values
above described.
Replacement of the nozzle (in the
case where the type of network gas is
different from that for which the ap-
pliance is preset- see chapter 6).
START
DESCRIPTION OF STOP MODES
emergencies, in the event of immi-
nent danger, it is mandatory to clo-
se all the locking devices on the
supply lines upstream the applian-
ce (e.g. Water-Gas-Electrical).
- 12 -
If the measured pressure is
lower than the 20% compared
to the nominal pressure (ex.
If the measured pressure is hi-
gher than the 20% compared to
the nominal pressure (ex. G20
The constructor firm does not
recognise the machines war-
ranty in case the gas pressure
Make sure there are no gas leaks
After controlling the pressure
and type of gas supply interven-
tion may be required, such as: 1.
Generally, In stoppage condi-
tions caused by faults and
5.