Relay Outputs 1-4
SHDN jumper
EOL Resistors 1-4
Shutdown jumper (SHDN) must be removed from
301-C, 301-AP, and 301-ADI controllers to initiate
power-up.
Risk of electrical shock - disconnect all power (input
and relay) before servicing.
Once wiring has been completed, remove the shutdown jumper (SHDN)
from all devices where applicable to initiate power-up.
Close the unit cover.
Program system (and all devices) in accordance to the application require-
ments and device instructions.
Perform a system test (commissioning) to complete the installation.
18
Description
Depending on the desired
configuration, connect the relay cables
to either N.O. or N.C. Relays 1 and 2
are controlled by either internal events
or by BACnet; relays 3 and 4 are
driven only by internal events.
Place the jumper over the Shutdown
header pins to reset or restart the
system.
Place the jumper over the header pins
to include resistors to attenuate
communication echoes.