PRE-INSTALLATION CHECKS
a
The installation must be carried out by qualified per-
sonnel in compliance with the current legislation,
standards and regulations, and with the instructions
provided in this manual
Before proceeding with the product's installation, it is necessary to:
– Check the integrity of the supply
– Check that all the materials are in good working order and suitable
for the intended use
– Make sure that the structure of the Swing gate is suitable for being
automated
– Make sure that the characteristics of the Swing gate fall within the
operating limits specified in the "Product usage limits" paragraph
(page 5)
– Verify that there are no points of greater friction during the opening
and closing movements along the entire path of the Swing gate
– Verify that the area where the gearmotor is installed allows for unlock-
ing the latter and manoeuvring easily and safely
– Verify that there is no risk of derailment of the leaf or that it may come
off the guides
– Make sure that the overrun mechanical stops are sturdy enough and
that there is no risk of the deformation even when the leaf strikes the
mechanical stop vigorously
– Verify that the gate leaf is well balanced: it must not move by itself
when left in any position
– Make sure that the area where the gearmotor is fixed is not subject to
flooding. If necessary, mount the gearmotor raised from the ground
– Verify that the mounting points of the various devices are protected
against impacts and that the mounting surfaces are sufficiently sturdy
– Components must never be immersed in water or other liquids
– Keep the product away from heat sources and open flames and acid,
saline or potentially explosive atmospheres; these may damage the
product and cause malfunctions or dangerous situations
– Connect the control unit to an electricity supply line equipped with a
safety earthing system
– If there is an access door in the gate, or within its range of movement,
make sure that it does not obstruct the gate's normal path; install an
appropriate interlock system if necessary
– The power line must be protected by an adequate residual-current
device
– Mount a device on the electric power line that completely discon-
nects the automation from the grid. The disconnection device must
have contacts with a sufficient gap to ensure complete disconnec-
tion, under the Category III overvoltage conditions, in accordance
with the installation instructions. Should it be necessary, this device
guarantees fast and safe disconnection from the power supply; it
must therefore be positioned in view of the automation. If placed in a
non-visible location, it must have a system that blocks any accidental
on unauthorised reconnection of the power supply, in order to pre-
vent dangerous situations. The disconnection device is not supplied
with the product.
– For the system to work properly, mechanical stops (not included in
the kit) must be provided on the floor or wall, positioned at the points
of maximum opening and closing.
8 – ENGLISH
3 - INSTALLATION
3 2
INSTALLING THE GEARMOTOR
a
Incorrect installation may cause serious physical injury
to the person working on the system or to its future
users
Before starting to assemble the automation, complete
the preliminary checks described in the "Pre-installa-
tion checks" paragraph (page 8) and the "Product us-
age limits" paragraph (page 5)
To install RIVA200M:
if the support surface already exists, the gear motor must be fixed di-
rectly to the surface using suitable means, for example expansion bolts;
otherwise, to install the gear motor:
1
dig a suitably sized foundation using the indicated measure-
ments as a reference ("Figure 4")
2
provide a conduit for the power cable and one for water drain-
age
4
3
place the foundation box (A) inside the excavation with the hole
(B) aligned with the axis of the upper hinge ("Figure 5")
5
B
A
loading