The automation must be subjected to maintenance work on a regular
basis in order to guarantee it lasts.
a
Maintenance must be carried out strictly in compliance
with the safety provisions provided in this manual and
in accordance with the laws and regulations in force
To carry out maintenance on the gearmotor:
1
schedule maintenance interventions within maximum 6 months
or after maximum 3.000 manoeuvres from the previous mainte-
nance intervention
2
disconnect all power supplies, including any back-up batteries
l
This product is an integral part of the operator and
must therefore be disposed of with it
As with the installation, only qualified personnel must dismantle the
product at the end of its life.
This product is composed of different types of materials. Some of these
materials can be recycled; others must be disposed of. Please enquire
about the recycling or disposal systems in place in your local area for
this type of product.
a
WARNING
Some parts of the product may contain polluting or
dangerous substances If not disposed of correctly,
these substances may have a damaging effect on the
environment and human health
38 – ENGLISH
9 - PRODUCT MAINTENANCE
3
check for any deterioration in the materials making up the au-
tomation, with special emphasis on erosion or oxidation of the
structural parts; replace any parts that are not to standard
4
check the state of wear of moving parts: pinion, rack and all gate
leaf components; replace any worn parts
5
connect the power supplies again and run all the tests and
checks described in the "Testing" paragraph (page 27).
10 - PRODUCT DISPOSAL
l
As indicated by the symbol shown
here, this product must not been
disposed of with household waste
Separate the waste for disposal and
recycling, following the methods
stipulated by local regulations, or
return the product to the seller when
purchasing a new product
a
WARNING
Local regulations may impose heavy penalties if this
product is not disposed of in compliance with the law