Calibration; Overview; Calibration Pump - Ecolab Elados EMP IV E60 Notice Technique

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.4

Calibration

10.4.1

Overview

The procedure and display during the calibration process differ depending on whether or not
an oval gear meter is connected.
Fig. 10.42
10.4.2

Calibration pump

10.4.2.1 Preparation
Fig. 10.43
10.4.2.2 Calibration / Start
Fig. 10.44
to
: The pump runs 122 strokes (ca. 1 min).
The strokes are counted down from 122 to 0.
NOTE
By activating the 'Menu/Exit' function, the running calibration can be interrupted.
to
: After the running process, the amount removed from the measuring cylinder
(see chapter
This quantity is then entered as the calibration value (in ml or l).
417101799_EMP_IV_E60.docx
 Connect the pump ready for operation on the
 Fill a suitable measuring cylinder and insert the
10.4.2.1
Preparation") must be read off.
- 103 -
pressure side (see section
device").
suction line.
The volume of the measuring cylinder
should be 1/50 of the metering pump rate in
litres/h.
During this process, the suction tube must
not change its position.
The calibration of the metering pump is only
valid for the currently set stroke length
setting. After changing the stroke length, the
calibration must be performed again.
Calibration pump:
• see chapter
10.4.2
Calibration pump with
oval gear meter:
• see chapter
10.4.3
7
"Installing the
Rev. 9-06.11