Foundation Plan; Hydraulic Connection; Sampling With A Flow Assembly - Endress+Hauser ASP Station 2000 Mode D'emploi

Masquer les pouces Voir aussi pour ASP Station 2000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASP Station 2000
"
Endress+Hauser
3.3.3

Foundation plan

Fig. 4:
Foundation plan (all data in mm)
A: Fixing points (4 x M10)
B: Cable pit
C: Outflow for condensation water
D: Bottom hose entry (optional)
E: Outflow for overflow
3.3.4

Hydraulic connection

• Maximum suction height: standard 6 m; optional: 8 m
• Maximum hose length: 30 m
• Hose connection diameter: 13 mm, 16 mm or 19 mm internal diameter
• Suction velocity: >0.5 m/s, acc. to EN 25667
Caution!
• Always lay the sampling hose in such a way that it rises from the sampling point to the sampler.
• The sampler must be above the sampling point.
• Avoid siphon formation in the sampling hose.
Sampling point
Requirements of the sampling point:
Caution!
• Do not connect the sampling hose to pressurised systems.
• Use the suction filter to impede coarse and abrasive solids and solids which can cause clogging.
• Immerse the suction hose in the direction of flow.
• Take the samples at a representative point (turbulent flow; not directly at the bottom of the chan-
nel).
Useful sampling accessories
• Suction filter:
Impedes the entry of coarse solids and solids which can cause clogging.
• Immersion assembly: the adjustable immersion assembly fixes the sampling hose at the sampling
point.
• Hose end piece
Order numbers, see "Accessories" on page 109.
3.3.5

Sampling with a flow assembly

The sample is taken directly from the flow assembly which is installed in the cabinet base.
3 Installation
75

Publicité

Table des Matières
loading

Table des Matières