Aventics HF03 LG Mode D'emploi page 69

Masquer les pouces Voir aussi pour HF03 LG:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 87
Table 9:
S2 switch assignment
Slider
Function
2.1
Power supply control
byte 1
2.2
Power supply control
byte 2
2.3
Power supply control
byte 3
2.4
Power supply control
byte 4
AVENTICS | EtherCAT | R412012792–BDL–001–AB
Switch position 1
U
Q1
(external supply, PIN 2,
white)
U
Q1
(external supply, PIN 2,
white)
U
Q1
(external supply, PIN 2,
white)
U
Q1
(external supply, PIN 2,
white)
How to assign the valve supply:
1. Open screw cap B (see figure on page 65).
2. Using the S2 sliding switch, assign one of the two
supply voltages U
figure on page 68 and Tab. 9).
Commissioning and operation
Switch position 2
(external supply, PIN 4,
black)
(external supply, PIN 4,
black)
(external supply, PIN 4,
black)
(external supply, PIN 4,
black)
or U
to each valve group (see
Q1
Q2
69
U
Q2
U
Q2
U
Q2
U
Q2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hf04 d-sub

Table des Matières