Commissioning The Bus Coupler - Aventics HF03 LG Mode D'emploi

Masquer les pouces Voir aussi pour HF03 LG:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 87
Table 13:
Meaning of the General Purpose Inputs (GPI)
GPI [...]
Meaning of the bits
12
ON
OFF
13
ON
OFF
14
ON
OFF
15
GPO
[15]
AVENTICS | EtherCAT | R412012792–BDL–001–AB
Switch S1.3 CLOSE
and valve supply U
Q1
Valve supply U
> 12 V
Q1
Switch S1.2 CLOSE
and valve supply U
Q2
Valve supply U
> 12 V
Q2
Switch S1.1 CLOSE
and short circuit/open loop valve coil
No valve coil diagnostic message
OFF (default)
ON service

7.4 Commissioning the bus coupler

Before commissioning the system, the following steps
must have been carried out and completed:
You have assembled the valve terminal and the bus
W
coupler (see "Assembling the valve system with the
bus coupler" on page 57).
You have connected the bus coupler (see "Connecting
W
the bus coupler electrically" on page 59).
You have made the settings and configured the
W
system (see "Making settings" on page 65).
You have configured the bus master so that it controls
W
the valves correctly.
Commissioning may only be carried out by qualified
electrical or pneumatic personnel or an instructed
person under the direction and supervision of
qualified personnel
(see "Personnel qualifications" on page 51).
Commissioning and operation
< 12 V
< 12 V
77

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hf04 d-sub

Table des Matières