3.5.2 Transporting the machine
Never transport the PRZ rail drilling machine with the engine running, even at idle.
Never move the rail drilling machine in a vehicle with the drill attached. Always disconnect the pressurised
tank from the rail drilling machine.
During transport, carefully tie down the machine and the pressurised tank in order to immobilise them.
The machine must only be transported in the flat position shown opposite. This avoids fuel leaks and rising
oil, which may cause starting difficulties the next time the machine is used.
3.5
3.5
PR2_Gb_00957_110725.doc